|
|
|||||||
Reinstalling the Hardware
by
Jacqui Cook
on Sat 04 Dec 2004 09:09 PM EST | Permanent Link
Once the deckwork was finished, we had to reinstall all the hardware. This was a multistep process that included locating the piece, cleaning the piece, drilling the holes, dryfitting, taping, and then reinstalling with the 3M deck calking. Finally the tape is removed and any 'leaked' sealant is cut away, carefully. It took us 8 weekends to complete the work.
Comments
Steave Rasson
by
Anonymous
on Sat 03 Sep 2005 04:51 PM EDT | Permanent Link
This theme is not actual!
Trackbacks
TrackBack URL: |
|||||||